AFTER THE BELL: Durban port’s crane crisis threatens SA’s private sector logistics drive
By Stephen GrootesSouth Africa
%2Ffile%2Fattachments%2Forphans%2FATB-Cranes_552831.jpg?w=900&fmt=webp&q=80&fit=cover)
AI summary
Sign in to read the summary
As cargo backlogs deepen at Durban Gateway Terminal, freight costs are soaring, supply chains face disruption and shipment company ICTSI risks losing the trust needed to fix the port.
Follow the story
About this article
- Length
- 29 words · 1 min read
- Published
- November 17, 2026
- Byline
- Stephen Grootes
- Source
- Daily Maverick