Kumasi: GRIDCo gives Ejisu encroachers 30 days to vacate transmission corridor

AI summary
Sign in to read the summary
The move forms part of an intensified sensitisation and eviction exercise aimed at clearing encroachments from GRIDCo’s transmission Right of Way (RoW).
Follow the story
About this article
- Length
- 22 words · 1 min read
- Published
- September 16, 2026
- Byline
- Ibrahim Abubakar
- Source
- 3news