Morogoro motorists set for 60pc fuel cost cut as new CNG station set to open in October

AI summary
Sign in to read the summary
The station, constructed by Natenergy/MoroPower, is designed to serve between 600 and 800...
Follow the story
About this article
- Length
- 13 words · 1 min read
- Published
- September 12, 2026
- Byline
- juma mtanda
- Source
- The Citizen