Elektron’s 40MW plant set to boost Lagos power supply
AI summary
Sign in to read the summary
The project, known as Victoria Island Power, was developed in partnership with Eko Power Ltd. and would begin commercial operation in December 2026.
Follow the story
About this article
- Length
- 23 words · 1 min read
- Published
- September 25, 2026
- Byline
- Ayorinde Oluokun
- Source
- PM News Nigeria